Well-sweep, member most key arched more bridge pole one of,,, adaptability concern bridge the security and use durability normallies of structure its dependability. OVM construct and offer one a kind of new research and well-sweep that improves mosts , pole's guy cable anchor solid department and technological solutionses to engineering design by company, In order to solving for many years domestic.

Hanger rod, tie rod is arched bridge most valve key of one of the structural member, its dependable, freeze thaw durability, adaptability relate to to bridge structure of safety and normal praxis.
OVM syndicate direction engineering design and construction tender a kind latest research and betterment of hanger rod, tie rod back stay anchor solid body system and technique solution, with settle polypeptide in the last years concerning said system amid of many subject.
...........................................................................................
OVM basic schemes and propose, OVM's the new achievements in research mosts of company who company offer, Its outstanding characteristic is:
1)It is safe, reliable to offer one, resist tired performance and antiseptic performance well, Easy OVMLZM well-sweep system and reliable constructing OVMXG steel that help entangle department of line pole system that constructs.
2)Most new well-sweep system adopt new-type PES( FD) low all antiseptic to ask for body, new-type waterproof structureses and lean towards ball that put entangle device multiple new technology, new structures stresseses, Solve and ask for short times fracture, underpart enter sheath and short well-sweeps meet out of shape problem water HDPE body from whole, Improve the security and durability of the well-sweep effectively.
3)Newest its short well-sweep scheme of system of well-sweep can adapt to tying vertical displacement in the bridge floor , Reduce short well-sweeps because bridge floor vertical additional strengths raise the security of the structure.
4)Solid departments that one a kind of most new-type steels entangle department of line pole system department of OVMXG pole anchor, it adopt antiseptic structures all and prevent and ask for body new technology who stress fracture, Form a complete set the careless system of anchor with high reliable anchor careless performance under the low stress state. However, at traditional parallel department of steel wire poles easy installations have good antiseptic performances department of OVMXG pole anchor solid departments.
According to the reality of the project, Liuzhou OVM company can also be according to the needs of actual project, Carry on the special well-sweep, designed and form a complete set by the pole system.
For guaranteeing the safe handling and benefit daily maintainings of bridge, OVM use OVM technology and at company of OVM installation to complete set by company( or be guided and be installed) well-sweep, it offer well-sweep of it is pole systematic maintaining and cured and propose.

OVM syndicate tender of basic scheme and submittal, is OVM syndicate of latest research fruit, its sailing over of characteristics is:
1) tender a kind safety, firm, have good antienzyme fatigue performance sum rot proof performance, easy to construction of OVMLZM hanger rod system sum firm, construction amenity of OVMXG steel stranded wire tie rod system.
2) latest of hanger rod system adoption new model PES( FD) low stress whole rot proof cord corpus , new model flood control structure sum can be partial to pendulum of ball lay apparatus iso - several new techniques, new structure, from the intake workinteger settle cord corpus HDPE jacket short time shake, down terminal inflexion sum short hanger rod adaptation strain of subject, availably stilted hanger rod of safety and freeze thaw durability.
3) latest of hanger rod system its short hanger rod scheme able adaptation let up short hanger rod because of bridge face longitudinal direction displacement generate of addition towing force because of bridge face system longitudinal direction displacement, from, stilted structure of safety.
4) OVMXG tie rod anchor solid body system is a kind latest model steel stranded wire tie rod system, its adoption whole rot proof structure and keep cord from corpus stress shake of new techniques, amalgamation kit have under lowly the stress the status higher - firm anchor 固 performance of anchor 固 system.Thereupon, OVMXG tie rod anchor solid body system ratio tradition of parallel expanded metal lathing tie rod more easy installation sum have better rot proof performance.
According to engineering of physical truth, 柳 state OVM syndicate may also with according to practice engineering of requirement, steer special hanger rod, tie rod system design and kit.
For ensuring bridge of safety praxis sum easy to day - to - day of maintenance, OVM syndicate will vs complete set praxis OVM technique amalgamation from OVM syndicate installation( or instruct installation) of hanger rod, tie rod system tender hanger rod, tie rod system of maintenance sum curing submittal.

...........................................................................................   
The new-type well-sweep anchor solid of OVM is a main technical feature index:
Performance reach " prestressing force muscle at anchor have, clamping apparatus and person who join" GB/T 14370-2000 of the requests quiet years; The anchor has R 95% of |? A ¨ of coefficient of efficiency, |??Y 2% of percentage elongation of limit;
Tired performances reach" hot to crowd polyethylene high-strength steel wire guy cables cable-stay bridge" GB/T 18365-2001 of the requests; The stress upper limit of the well-sweep , is 0. 4 |ò bs, lower limit of the stress is 0. 28 |ò bs, pass quite 5% in the total amount of broken silk after pulse 2 million times loading.
The macroscopical elastic mould quantity of the well-sweep : E?Y1. 9§?105MPa.
Ask for outer HDPE static stress of body and release the index: x?Y0. 3.
It is most heavy to allow the rotating amount seat for sphere to prop up: |á =?à4O ?÷Waterproof performance : All the waterproof structure. ?÷Ask for HDPE's performance of body: Accord with" hot to crowd polyethylene high-strength steel wire guy cables cable-stay bridge" 18365-2001 GB/T at request on" building cable spend the high density polyethylene plastic". ?÷High-strength steel wire performance : 1670 MPas of |ò b ?Y of tensile strength, other performance are not lower than GB/T by 17101-97 of the requests .

OVM new model hanger rod anchor solid body system main technique performance fducial mark:
△ stat carry performance hit 《 tendon use anchor, tongs sum synthetase machine 》 GB/ T14370-2000 of solicit;Anchor efficiency coefficient η A ≧ 95%, limit extention rate ξ≥ 2%;
△ fatigue performance hit 《 cable stayed bridge caloric extrusion  ethene higher - strong expanded metal lathing back stay technique regulation 》 GB/ T18365-2001 of solicit;Hanger rod stress upper bound, for 0.4 σ b, stress down limit 0.28 σ b, after 2,000,000 times pulse add carry off silk not very in total amount of 5%.
△ hanger rod macro view flexibility shuttering quantity:E ≥ 1.9 х 105 MPa.
△ cord corpus exoenzyme lay HDPE quiescent stress release index:X ≥ 0.3.
△ spheroid support abutment maximum allowance rotary quantity:α = ± 4 O
△ flood control performance:Holoenzymes flood control structure.
△ cord corpus HDPE performance:Conform 《 cable stayed bridge caloric extrusion  ethene higher - strong expanded metal lathing back stay technique regulation 》 GB/ T18365-2001 sum 《 build cable cord use high definition  ethene lastics 》 of solicit.
△ higher - strong expanded metal lathing performance:Antienzyme pull strength σ b ≥ 1670 MPa, other performance anti lower than GB/ T17101-97 of solicit.
...........................................................................................

系杆静载试验
低应力全防腐索体试验


It is that the anchor solid of the pole is a main technical feature index that OVM is new-type: ?÷Performance reach " prestressing force muscle at anchor have, clamping apparatus and person who join" GB/T 14370-2000 of the requests quiet years; The anchor has R 95% of |? A ¨ of coefficient of efficiency, |??Y 2% of percentage elongation of limit; ?÷Tired performances exceed " prestressing force muscle at anchor have, clamping apparatus and person who join" GB/T 14370-2000 of the requests, Namely the stress upper limit of the pole, is 0. 65 |ò bs, a value of stress is 100 MPas, passes quite 5% in the total amount of broken silk after pulse 2 million times loading.
?÷Low stress anchor careless performance : Allow in 0. Use under a |ò b state. ?÷It is the macroscopical elastic mould quantity of the pole: E?Y1. 9§?105MPa. ?÷Waterproof( anticorrosion ) performance : It is the pole and ask for the body as all all waterproof all antiseptic structure. ?÷Ask for HDPE's performance of body: Accord with the request that" the building cable . ?÷The line performance that the steel entangles: Tensile strength |ò b ?Y No. 1860, other performances less than" prestressing force entangle " GB/T 5224-1995 of the requests line with steel by concrete.

OVM new model tie rod anchor solid body system main technique performance fducial mark:
△ stat carry performance hit 《 tendon use anchor, tongs sum synthetase machine 》 GB/ T14370-2000 of solicit;Anchor efficiency coefficient η A ≧ 95%, limit extention rate ξ≥ 2%;
△ fatigue performance overbalance 《 tendon use anchor, tongs sum synthetase machine 》 GB/ T14370-2000 of solicit, scilicet tie rod stress upper bound, for 0.65 σ b, stress amplitude number for 100 MPa, after 2,000,000 times pulse add carry off silk not very in total amount of 5%.
△ low stress anchor  performance:Allowance under 0.1 the σ the b the status praxis.
△ tie rod macro view flexibility shuttering quantity:E ≥ 1.9 х 105 MPa.
△ flood control( rot proof) performance:Tie rod and cord corpus for holoenzymes flood control whole rot proof structure.
△ cord corpus HDPE performance:Conform 《 build cable cord use high definition  ethene lastics 》 of solicit.
△ steel stranded wire performance:Antienzyme pull strength σ b ≥ 1860 MPa, other performance anti lower than 《 prepare stress concrete use steel stranded wire 》 GB/ T5224-1995 of solicit.

...........................................................................................
OVM新型吊杆和系杆体系相关专利

专 利 号
专 利 名 称
ZL02236404.8
拱桥吊杆组件
ZL02234484.5
外层无应力索体
ZL97220323.0
钢绞线群锚拉索锚具的夹片防松脱装置
ZL99201876.5
吊杆锚具偏转校正装置


1. Protect and cover 2. The well-sweep anchor is 3. Nut is 4. Spherical support is 5. Join 6 of surface. Have and bury and in charge of 7 in advance. Oiling hole is 8. Antiseptic oil is 9. Cover 10 airtightly. Heat draws back 11 of set. Cover 12 waterproofly. Join 13 of set. PES( FD) asks for 14 of body. Pavement isolate and bring 15 structure by board. The ball cuts with scissors 16 of device . Heat draws back 17 of set. Crossbeam is 18. Leave and bury and in charge of 19 in advance. Antiseptic oil is 20. Nut is 21. Protect and cover 22. Antiseptic oil is 23. Backing board of anchor is 24. Pull rod is 25. The transition covers 26. Shock attenuation device is 27. Waterproof platform is 28. Backing board of anchor is 29. Stainless steel sleeve pipe is 30. Antiseptic oil

1.The safeguard covers 2.Hanger rod anchor 3.Nut 4.Spheroid leg 5.Arch face 6.Upper prepare  tube 7.Oil hole 8.Rot proof olein 9.Air tight seal hood 10.Caloric  set 11.Flood control hood 12.Synthetase set 13. PES( FD) cord corpus 14.Side pavement board or isolate band structure 15.Ball hinge apparatus 16.Caloric  set 17.Transverse beam 18.Down prepare  tube 19.Rot proof olein 20.Nut 21.Safeguard hood 22.Rot proof olein 23.Anchor liner plate 24.Tension bar 25.Transitional water hood 26.Dynamic oil damper 27.Flood control stand 28.Anchor liner plate 29.Stainless steel annular tubes 30.Rot proof olein

吊杆局部Hanger rod local
吊杆防护hanger rod protecting
系杆成品索tie rod completed product cord
系杆锚具tie rod anchor

天津彩虹桥

Product appliance-- engineering illustration

产品应用——工程实例