Including, ask for saddle, come loose and ask for saddle(
one), cord clip, main cables,etc. mainly anchor heavy
stone used as an anchor prestressing force anchor solid
departments OVM suspension bridge products OVM. Suspension
bridges by anchor use by large-scale suspension bridge
for by each at heavy stone used as an anchors anchor solid
departments, Link and, in the future independent cables
load and transmit heavy stone used as an anchor concrete
TV station mound anchor main cables, It is the key structure
of hanging Suo Qiao, it designs, construct quality to
hanging using the security to have decisive function of
Suo Qiao, And is known as the lifeline project which hangs
Suo Qiao complicatedly by the strength state because of
its having replaceably nature. Suspension bridge ask for
saddle, come loose and ask for , products the bridge type
important receiving strength part cord clip,etc. saddle(
one) mainly by main tops of the tower.
The suspension bridge anchor has two kinds mainly solidly:
Section steel anchor solid department and prestressing
force anchor solid departmentses, the latter at prestressing
force the differences of material, Divide at prestressing
force thick reinforcing bar anchor solid departmentses
and prestressing force steel entangle line anchor solid
departments. Seeing that prestressing force solid and
useful steel save, construct and help , structure succinct,
receive strength merit clear, safe and reliable by quantity
department anchor, Consider steel entangle that anchor
have line many specification, one draw heavy tonnage,
steel entangle line fix a chi of length only allow, Can
person who link needn't wait for merit, OVM select prestressing
force entangle anchor solid departments at direction of
developping line by steel by suspension bridge anchor
heavy stone used as an anchor prestressing force anchor
solid departments.
OVM
rope suspension bridge product include OVM anchor prestress
anchoraging system, main rope saddle, kd cord saddle(
set), wire grip, main cable...etc..
Rope suspension bridge use anchor anchor solid body
system is a kind used for large rope suspension bridge,
adjoining lord cable cord and anchor stand , future
independence cable of lading transmission to anchor
stand of structure, is rope suspension bridge of valve
key structure, its design, construction mass vs rope suspension
bridge of praxis safety have decision of action, subject
to it have can't replacement and suffer towing force status
complicacy but drive call rope suspension bridge of Life
Line engineering.But rope suspension bridge lord tower's
column summit main rope saddle, kd cord saddle( set),
wire grip iso - product is this kind of bridge pattern
significance suffer towing force parts.
Rope suspension bridge anchor solid body system main have
two kind:Section steel anchor solid body system different
from prestress anchoraging system, the latter again according
to prepare stress material of, can is divided into prepare
stress raw steel anchor solid body system sum prepare
stress steel stranded wire anchor solid body system.Whereas award
two trample stir
up throw paper surname last home climb
cure paper surname 叨ǔ叱ざ alkyne fascine mattress
circle flick throw VM rope suspension bridge
anchor prestress anchoraging system make selection prepare
stress steel stranded wire anchor solid body system feasance
triturate development direction.

he tight cable is tested
The cord clip is resisted and slips and tested
After the suspension bridge asks for the saddle and takes
shape
Tight cable floc test
Wire grip antienzyme slippery floc test
Rope suspension bridge cord saddle shaping post
At Ministry of Communications
highway planning and design institute and OVM of Liuzhou
company( former Liuzhou building of city mechanical head
factorieses) propose plan of design together anchor heavy
stone used as an anchor prestressing force anchor solid
departments OVM, Set up the project to study by OVM company
technique center, And at Ministry of Communications highway
planning and design institute,, way of Xiamen bridge construction
investment 3 of head office consult and form and unite
a PR girl company OVM, Unite the public relations to this
system. Will it be October 1997, this system accept Xiamen
pay attention to office at this solid the authorizations
of departments engineer by deep blue of sea bridge inspector
general, Its feasibility has been gotten definitly. Xiamen
determine and adopt here new-type anchor heavy stone used
as an anchor prestressing force anchor solid departmentses
by deep blue of sea bridge --Suspension bridge OVM anchor
heavy stone used as an anchor prestressing force anchor
solid departments, try out and succeed. In deep blue of
sea the successes of bridge use, belong to the first time
still at home this solid departments.
This technology adopt
pairs of pull rod, pairs of bunches of prestressing force
muscle wait for new-type anchor heavy stone used as an
anchor prestressing force anchor solid departmentses,
The plan of design is rational , modern techniques, the
structure is novel, Safe and reliable, performance is
steady, it is convenient to construct, Have filled in
the domestic blank, is in leading competence at home,
can not merely popularize at home , Also for being of
our country suspension bridge increase one a item of new
technologies is and not for being of our country prestressing
force move towards world market exert a positive, far-reaching
influence by products by anchor heavy stone used as an
anchor anchor solid departments.
The suspension bridge
mainly asks for the saddle in order to support the main
cable, and the main cable is spread to the main tower
to strength vertically . The structure that OVM mainly
asks for the saddle has a saddle of troughs, seat body
and bottom and three major parts of board which form mainly.
The saddle trough is used to hold and support a main cable
of each directly, take the form of arc vertically , The
radius is about 8~12 times of the main cable diameter.
Body to ask for seat saddle transmit vertically, top unite,
The underpart connects with base board. Board to preset
bottom at top of the tower in order to supporting saddle
s of the parts of body, it make. For satisfying suspension
bridge construct saddle restore to the throne and slip
the need moved simply in advance course, Bottom boards
and seat body the end need for boardses set up and slip
device ,from roller axle slide is, not in asking for boards
and seat body the end board spraying antifriction pharmaceutical
or other ways for less than saddle the end mainly four
Fluorines.
Suspension bridge come
loose and ask for one support and change direction and
disperse saddle( one) each benefit main cable anchor careless
function with OVM. OVM install at main cables, at main
cables and sling play a binding role, play a regular type
closely role to the main cable by cord clip.
The main cable which
hangs Suo Qiao is a main bearing member , loadsing and
transmits the main cable through the well-sweep on the
bridge of function . The well-sweep and main cable are
bound through the cord clip , so the design and construction
of the cord clip of suspension bridge are parts of a importance.
The precision of making of the cord clip , error of installing,
and put more energy into exerting an influence the well-sweep
by strength of the roof beam directly . Cord clip usually
shape hollow to cast steel one drum OVM. Casting becomes
two semi-circular half a cord clip while making, after
two and a half cable double-layered quilt is installed
on the main cable, And then stand up with high-strength
bolt butt joint. And urgent careless high-strength the
numbers of boltseses depend on that position receive to
glide the lengths of cord clip strength fix by size installation
cord clip, Main tower receive most heavy strength by position
of both sides cord clip, longest cord clip; The cord clip
receives strength minimumly while stepping, the cord clip
is the shortest too. OVM the forms of cord clip, generally
with having vertical to sewing and divide into level form
tooth matrix, Its have with the hookup ways of sling saddle
ride.
OVM
anchor prestress anchoraging system from Ministry of
Transportation & Communications public highway layout
design and state OVM syndicate( original
state City
build machine total plant) coordinate submission design
scheme, from OVM syndicate technique center 立 item research,
amalgamation through Ministry of Transportation &
Communications public highway layout design , the syndicate
of OVM, Xiamen road bridge construction investment head
office three home negotiate constitutive enzyme unite
public relations squad, paraquinones said system steer
unite public relations.1997 October, said system accept
Xiamen sea large bridge general inspector reason engineer
office paraquinones said anchor solid body system of judgement,
its feasibility receive ratify.Xiamen sea 沧 large bridge
decision adoption this new model anchor prestress anchoraging
system —— rope suspension bridge OVM anchor prestress
anchoraging system, amalgamation trial win.Said anchor
solid body system in the sea 沧 large bridge of win operation,
in the inland still belong to first time.Said technique
adoption dipeptide tension bar, dipeptide bundle tendon
iso - new model anchor prestress anchoraging system,
design scheme reasonable, technique first in, structure
novel, safety firm, performance stability, construction
amenity, fill up inland blank, be placed in inland leading
level, not only able in the inland expansion, but also
for our country rope suspension bridge anchor anchor
solid body system hike an item new techniques, and prepare
for our country stress product strike world market generate
positive, profound of affect.
Rope suspension bridge main rope saddle in order to bearing
support lord cable, amalgamation lord cable station suffer
lengthways spread to towing force direction lord tower's
column.OVM main rope saddle of structure main there is
saddle trough, mount corpus sum bottom three bulk analysis
constitutive enzyme.Saddle trough in order to direct accept
sum bearing support lord cable bundle section, longitudinal
direction report arc form, semidiameter about lord cable
diameter of 8~12 double.Mount corpus is main rope saddle
transmission lengthways direction compressive force of
master, upper part direct with saddle tank bottom department
diamidine for integral whole, lower part and bottom mount
board phase diamidine.Bottom is part to preset in tower's
column summit in order to bearing support saddle support
mount corpus , it make saddle support anti - towing force
uniform distribution in tower's column summit.For satisfaction
rope suspension bridge construction course amid saddle
support prepare be partial to homing slip of requirement,
bottom and mount corpus bottom need establish slider,
such as roller, tetrafluorohydrazine guide, slide bar,
slip sheet, in the main rope saddle bottom and mount corpus
bottom spray gun draw antifriction or other mode.
Rope suspension bridge use OVM kd cord saddle( set) rise
bearing support sway and dispersion bundle section easy
to lord cable anchor of action.
OVM wire grip installation in lord cable upper, since
vs lord cable sum hoisting cable rise coupling action,
again vs lord cable rise tight affix pattern action.
Rope suspension bridge of lord cable is main accept reconstruction
pc, action on the bridge of lading pass hanger rod transmission
arrive lord cable.But hanger rod and lord cable is design
to pass wire grip coupling, thereupon rope suspension
bridge wire grip and construction is a significance of
constitutive enzyme part.Wire grip of creation accuracy,
installation error, will direct vs hanger rod sum add
beam is generated by towing force affect.OVM wire grip
usually is barrel-drain hollow cast steel pc.Manufacture
hour mold into two half round of quasi wire grip, be two
quasi wire grip drive installation at lord cable upper
after, reuse higher - strong carriage bolt butt joint
get up.Wire grip of length and tight higher - strong
carriage bolt of piece depend on wire grip installation
part suffer of dropped towing force dimension, lord tower's
column two side part wire grip suffer towing force maximum,
wire grip most captain;Across amid wire grip suffer towing
force minimum, wire grip too most short.OVM wire grip
of form, generally with rectangle dentation level lengthways
direction seam is divided into two quasi, its with hoisting
cable of adjoining mode contain saddle trough ride hang
type sum ear board cotter adjoin quinonoid formula.
OVM悬索桥产品相关专利
| 专
利 号 |
专
利 名 称 |
ZL97220320.6
|
悬索桥预应力锚碇
|
ZL98216832.2
|
紧索装置 |